Loom Production Calculator

Results

Production per shift (8h):

Production per day:

Monthly production (26 days):

Loom Production Formula

Production (m/hr) = (RPM × 60 × Efficiency%) ÷ (PPI × 39.37)

Typical shuttle loom efficiency is 80–90%. Air-jet looms run at 85–95% efficiency. Multiply hourly production by working hours per day and 26 working days for monthly output.